{"product_id":"mce-hc-mpu-2","title":"MCE HC-MPU-2","description":"\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eManufacturer:\u003c\/b\u003e Motion Control Engineering (MCE)\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003ePart Number:\u003c\/b\u003e HC-MPU-2\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eComponent Type:\u003c\/b\u003e Main Processor Unit Board\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eSystem Compatibility:\u003c\/b\u003e MCE Hydro-Centrum \/ HMC Series Hydraulic Elevator Controllers\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eInput Voltage:\u003c\/b\u003e 5V DC \/ 24V DC logic supply inputs\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eMounting Type:\u003c\/b\u003e Card cage \/ rack-mounted PCB chassis assembly\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cb\u003eElevator Logic\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003ePrimary Processor Functions:\u003c\/b\u003e Executes central controller operational logic, dispatching decisions, safety string verification, and call registration management.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eDiagnostics \u0026amp; Signals:\u003c\/b\u003e Features onboard diagnostic LED status indicators for real-time monitoring of system states, fault conditions, and communication bus traffic.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eFirmware Execution:\u003c\/b\u003e Drives elevator parameter configurations, door operator timing sequences, and floor positioning logic via board-level firmware.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cb\u003eAccessories\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eEEPROM \/ Microcontroller Chips:\u003c\/b\u003e Socketted firmware ICs (sold separately or transferred from existing board).\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eInterfacing Hardware:\u003c\/b\u003e MCE Card Cage Guide Rails \u0026amp; Ribbon Cable Interconnect Sets.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eTerminal Blocks:\u003c\/b\u003e Direct-plug screw terminal headers for peripheral I\/O wiring.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cb\u003eMaintenance\/Code Details\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eJurisdictional Code Compliance:\u003c\/b\u003e Designed to meet ASME A17.1 \/ CSA B44 Safety Code for Elevators and Escalators requirements when installed within original OEM control systems.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eServiceability:\u003c\/b\u003e Recommended for direct visual inspection of onboard capacitors and solder trace integrity during routine preventative maintenance.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cb\u003eReplacement Protocol:\u003c\/b\u003e Ensure total line-power and battery backup isolation prior to removal or insertion to prevent static damage to processing ICs. Verifying software version compatibility with existing job parameters prior to installation is required.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eReplaces HC-MPU\u003c\/p\u003e","brand":"Parts4REM","offers":[{"title":"Default Title","offer_id":49912809193624,"sku":null,"price":0.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0741\/4369\/5000\/files\/rn-image_picker_lib_temp_f966d5ea-2781-481f-a2e1-ab2c7c27d003.jpg?v=1789498258","url":"https:\/\/parts4rem.ca\/products\/mce-hc-mpu-2","provider":"Parts4REM","version":"1.0","type":"link"}